Six services, one in-house team: survey, design, approvals, installation and lifetime maintenance — for homes, businesses, societies and farms across Ranchi, Jharkhand.
1–10 kW · Homes
Turn your terrace into a personal power plant. We survey your roof, size the system to your actual bill, file your PM Surya Ghar subsidy and commission in three days — with net metering so surplus units bank against winter.
10 kW–1 MW · Business
Electricity is your second-largest overhead? A captive rooftop plant cuts unit cost 40–60% for 25 years. We handle CEIG approvals, HT/LT coordination and SCADA monitoring — installs run without stopping your production shifts.
20–200 kW · RWAs
Lifts, pumps, lighting and club house — common-area loads eat 30–40% of society maintenance. A group-net-metered rooftop plant offsets them, with per-flat allocation reports your RWA can audit every month.
PM-KUSUM · Farms
Diesel pump costs ₹200+ per hour of watering; a solar pump waters free for 20+ years. We survey your borewell, size the right head-flow, and file the full PM-KUSUM subsidy — 60%+ of project cost in most cases.
LiFePO₄ · Backup
Outages don't wait for sunshine. Hybrid systems charge a lithium battery by day and switch you to it in under 20 milliseconds when the grid drops — fans, lights, Wi-Fi and inverter ACs never notice.
Any brand · AMC
Dusty panels lose 15–25% output. Our AMC keeps systems at peak: quarterly cleaning, thermal imaging of hot spots, string health checks and a generation report on your phone every visit. We service every brand — even systems we didn't install.
| On-Grid | Hybrid | Off-Grid | |
|---|---|---|---|
| Best for | Bills reduction, reliable grid area | Bills + backup for outages | No grid / remote sites |
| Upfront cost (3 kW) | ₹96,000 net of subsidy | ₹1.9–2.6 L | ₹2.4–3.2 L |
| Power-cut backup | None | 4–8 hrs | Full autonomy |
| Govt. subsidy | Up to ₹78,000 | On solar part | Not applicable |
| Net metering | Yes | Yes | No grid |
| Typical payback | 3–4 years | 5–6 years | 6–8 years |