Residential on-grid systems earn ₹30,000/kW for the first 2 kW and ₹18,000 for the third — capped at ₹78,000, so any system of 3 kW or more fetches the full amount. Groups housing societies and commercial units follow different schemes; we'll tell you honestly which applies to you.
You don't — we do. After installation we prepare your file on the national portal (ID proof, ownership proof, DISCOM application, commissioning certificate) and track it until the amount credits directly to your bank account, typically in 4–8 weeks.
Almost. Units charges can drop to near zero, but DISCOM keeps a small fixed charge per billing cycle (₹80–250 depending on connection). Most homes see bills fall 80–95%; we'll show you a month-by-month projection for your exact usage before you sign.
The PM Surya Ghar subsidy is one time per household (linked to Aadhaar + electricity connection). If you've used it at another address, the system still pays for itself in 4–5 years without subsidy — we'll model both scenarios for you.
Solar typically adds 3–4% to resale value and sells homes faster. The system transfers with the property; net-metering agreements are reassigned to the buyer with one DISCOM form — our office handles the paperwork for both sides.
System & Installation
5 answers
Roughly 85–90 sq.ft per kW of shade-free roof. A typical 3 kW system needs about 255 sq.ft. Water tanks and chimneys are fine — we elevate around them so your terrace stays usable.
Only Tier-1 monocrystalline PERC panels (575–585 Wp, 22.5% efficiency, 25-year performance warranty) from banks-approved brands like Waaree, Adani and Vikram Solar, paired with string inverters carrying 5–10 year warranties. No B-grade stock, ever — the datasheet is printed on your quote.
Yes — panels generate 20–45% of peak output even on overcast days, and cold sunny winter days are actually more efficient. Over a year, jharkhand installations average 115–125 units per kW per month, and net metering banks summer surplus against winter use.
A standard on-grid system shuts down for lineman safety. If backup matters, our hybrid systems switch to lithium storage in under 20 milliseconds — fans, lights, Wi-Fi and inverter ACs never notice. See the comparison table on our services page.
The 3.2 mm tempered glass is tested to 5,400 Pa loads — roughly a cricket ball at full pace or 25 mm hail. Mounting structures are engineered for 150 km/h wind, and every bolt is torque-checked and logged.
Approvals & Process
4 answers
Typical timeline: survey + quote in 48 hours → approvals 1–2 weeks → installation 2–3 days → net-meter activation 2–4 weeks. From first call to running system is usually 3–5 weeks, with WhatsApp updates at every step.
Net-metering approval from DISCOM is required for on-grid systems — we file and follow it for you. In gated societies you'll need an RWA NOC; we provide the template and attend the meeting if needed.
Not on your own floor, no. But your society can: a group-net-metered rooftop plant offsets common loads (lifts, pumps, lighting) and can allocate generation to flats. See our society service — we'll present the model at your AGM.
No. For sloped roofs we use flashed, sealed rail mounts; for RCC terraces we prefer non-penetrating ballasted structures where possible. Every penetration (if any) is double-waterproofed and carries a 5-year leakage warranty.
Costs & Finance
3 answers
Ballpark ₹58,000 per kW installed before subsidy — panels, inverter, structure, wiring, approvals and 5-year service included. Your quote is itemised line-by-line, firm for 30 days. Run your numbers on the calculator.
Yes — 90% financing through 9 partner banks at 8.5–10.5% for 3, 5 or 10 years. A 3 kW system starts around ₹1,499/month, and most customers find the EMI is less than their old electricity bill from day one.
Typically 3–4 years on-grid for homes (2.5–4 for commercial). After payback, the system generates essentially free power for 20+ more years — the 25-year cashflow chart on our calculator page shows exactly how it compounds.
Maintenance & Warranty
4 answers
Very little — no moving parts. Panels need a water rinse every 10–15 days (monsoon does it free). All packages include 5 years of free O&M: quarterly cleaning, electrical checks and generation reports via the app.
25-year panel performance · 5–10 year inverter (brand-dependent) · 10-year structural workmanship · 5-year free O&M and waterproofing. Warranty documents are handed over in a printed folder at commissioning — not fine print on a portal.
Our AMC (from ₹2,000/kW/year) continues the same quarterly care with a 48-hour fault SLA. We stock spare parts for every system we've installed since 2014 — most fixes happen in a single visit.
Yes — happily. Our AMC covers any brand. We start with a full health check (thermal scan, string test, earthing), fix what's broken, and put the system on our monitoring app from that day on.
Getting Started
3 answers
Three ways: call +91 788 047 5001, WhatsApp us, or fill the survey form. An engineer (not a salesperson) visits with shadow-analysis equipment, and you get a firm printed quote within 48 hours. No pressure, no follow-up spam.
Of course. Visit our Ranchi Experience Centre (running demo + cutaway mounting displays), or we'll connect you with a customer nearby — most say yes; 300+ have left public reviews.
Then we'll tell you plainly, in writing, why not — heavy shade, structure, or ownership issues. We decline roughly 1 in 8 surveys, and we'd rather lose a sale than install a system that underperforms.
🌤️
No answers match that yet
Try a different word — or just ask us directly, a human replies within 4 working hours.